Emergency Contingency Procedures
ECP
Recommended Lifeboat Launching Procedures
Doc No.: ECP 04-02B
Revision: 01
Date: 15 Oct 2024
Issued by: DPA
Approved by: MD

1. General safety precautions for launching and maneuvering of davit launched lifeboats, freefall lifeboats and rescue boats

For enhanced risk mitigation, the master may consider requesting shore assistance such as shore launch boats after discussion with the office when in port limits.


COUTION:

  • Follow the Flag state recommended procedure for lifeboat launching during drills, if more stringent to below recommended procedure.

2. Recommended procedure for launching and maneuvering of davit launched lifeboats and rescue boats

Step 1 – Prior to Commencing the Launch Step 2 – Unmanned Launching Step 3 – Deploying the Operating Crew Step 4 - Boarding Step 5 - Onload Release Step 6 - SOLAS Tests Step 7 - Re-securing Step 8 - Visual Verification Step 9 - Final Heaving and Securing

3. Recommended procedure launching and maneuvering of freefall lifeboat

3.1 : Training during Monthly Drills

The monthly abandon ship drills with free-fall lifeboats should be carried out according to the maker’s instructions, so that the persons who are to enter the boat in an emergency are trained to embark the boat, take their seats in a correct way and use the safety belts; as well as being instructed on how to act during launching into the sea.

SOLAS training manuals, posters, and signs shall be used to assist familiarization and the conduct of drills. Simulated launching should be carried out under the supervision of Chief officer and be conducted without the physical activation of the free-fall release system.

3.2 : Launching in Water

Below are the recommended steps to be considered. Vessels shall ensure compliance to maker’s instruction.

Step 1 Step 2 Step 3 Step 4 3.2.1 : For Simulated Launching 3.2.2 : For Freefall Launching 3.2.3 : For Launching with Secondary Means

For freefall launching and launching by secondary means, follow steps 5, 6, 7, and 8. For simulated launching, go to step 8.

Step 5 Step 6 Step 7 Step 8